New Project in Alicante with Building Permit Granted!

Allonbay Aura offers the opportunity to invest in a 25-home new-build development in Villajoyosa, on the beachfront, with planning permission granted and 56% reserved.

Nuevo proyecto en Alicante con licencia de obras concedida

Equipo Urbanitae

17 November 2023 · Updated: 24 August 2026

3 min read

Share:

IN THIS ARTICLE:

We are presenting a new capital appreciation project in Alicante with the building permit already granted. It will open for funding next Tuesday, 21 November at 16:00.

The Allonbay Aura project consists of the development of a new-build beachfront residential project comprising 25 homes with parking spaces and storage rooms.

More specifically, the development is located in northern Villajoyosa, in an area known as Allonbay, between the city centre and Benidorm, Alicante.

For this project, we will work with Quadratia, a real estate developer with more than 40 years of experience in the property development sector.

56% of the Development Reserved

This project will follow a capital appreciation strategy. Urbanitae investors will contribute €3,525,000, which will be delivered to the developer through a capital increase in the special purpose vehicle that will bring together all contributions from Urbanitae investors. This company will subsequently increase capital by €3,520,000 in the project development company. The remaining €5,000 from the funding campaign will remain in the special purpose vehicle to cover the company’s operating expenses.

The developer has an exclusive purchase option to acquire the plot on which the development will be built. In addition, the building permit has already been granted.

The project also has cash reservations for 14 of the 25 homes in the development, equivalent to 56%.

In this video, Sandra Bertomeu, International Sales Director at Quadratia, and Diego Bestard, CEO of Urbanitae, explain the key aspects of the project.

Return in 22-26 Months

The regulator of crowdfunding platforms does not allow estimated return figures to be communicated in capital appreciation projects. However, they can be easily calculated using the information available on the project page, through the following formula:

(Forecast revenue – Estimated expenses) / Total equity

The project has an estimated duration of between 22 and 26 months. In the fourth quarter of 2023, the capital increase and acquisition of the land are expected. Between the first and second quarters of 2024, the start of construction works is estimated. Between the third and fourth quarters of 2025, completion of construction, the first occupancy licence and delivery of the homes are expected. Finally, between the fourth quarter of 2025 and the first quarter of 2026, the liquidation of the company and distribution of profits to investors are estimated.

On Monday, 20 November, we held a webinar with the developer, where various questions were raised. You can watch the recording at the link. As always, you can send us any questions about the project at contacto@urbanitae.com or by calling 911 23 25 22.

About the author

Equipo Urbanitae

See more

Topics related to this article

Click a topic to explore

2026 Guide

Investor's Guide: Everything You Need Before Investing

A practical overview of the key issues in crowdlending and real estate equity.

Download guide

Newsletter

Don't miss any of our projects

Get new project announcements and the latest Urbanitae news in your inbox.

Subscribe

Nueva oportunidad de inversión en la plataforma

Proyecto de plusvalía en Cádiz con una TIR preferente de 14,2% en un plazo estimado de 22-26 meses.

Ver proyecto

Urbanitae Academy

Practical training for investors who want to go one step further. Courses, masterclasses and real cases.

Access Academy

Related reading

Invertir en flex living en Madrid: Flex Living San Blas. Invest in flex living in Madrid: Flex Living San Blas. Investir dans le flex living à Madrid : Flex Living San Blas. Investire nel flex living a Madrid: Flex Living San Blas. Investir em flex living em Madrid: Flex Living San Blas. In Flex Living in Madrid investieren: Flex Living San Blas.

Flex Living San Blas: 82 flexible accommodation units in Madrid

Flex Living San Blas transforme un immeuble existant en 82 unités d’hébergement flexible à Madrid, avec loyer minimum garanti, 20 % des fonds propres apportés par le promoteur, financement bancaire et sortie par la vente de l’actif stabilisé.

18 November 2026

Equipo Urbanitae

Invertir en hoteles en Tenerife: Playa de las Américas. Invest in hotels in Tenerife: Playa de las Américas. Investir dans des hôtels à Tenerife : Playa de las Américas. Investire in hotel a Tenerife: Playa de las Américas. Investir em hotéis em Tenerife: Playa de las Américas. In Hotels auf Teneriffa investieren: Playa de las Américas.

Playa de las Américas: 9.75% debt financing for an operating aparthotel in Tenerife

Playa de las Américas finances an operating aparthotel in Tenerife, with 106 apartments, €1.8 million in annual rental income, a first-ranking mortgage, 54.5% LTV and a fixed annual return of 9.75%.

13 November 2026

Equipo Urbanitae

Invertir en vivienda en Barcelona: Cornellà Riera. Invest in property in Barcelona: Cornellà Riera. Investir dans l’immobilier à Barcelone : Cornellà Riera. Investire in immobili a Barcellona: Cornellà Riera. Investir em imóveis em Barcelona: Cornellà Riera. In Wohnimmobilien in Barcelona investieren: Cornellà Riera.

Cornellà Riera: 12% bridging loan for 27 homes in Barcelona

Cornellà Riera finances the launch of a 27-home development in Cornellà de Llobregat through a 12% bridge loan, with approved bank financing, €2.3 million in equity and repayment after obtaining the permit and 40% pre-sales.

12 November 2026

Equipo Urbanitae

Urbanitae, leaders in real estate co-investment in Spain and Portugal

Opens the door to a diversified real estate portfolio

Invest now