On Friday 27 November at 12:00 (UTC+1), the Fénix project will open for investment. This new debt investment opportunity will finance the completion of a development comprising nine terraced houses in San Fernando de Henares, Madrid.
The development already has planning permission and construction is under way, with approximately 15% of the works completed. Urbanitae investors will initially participate through a €1.24 million tranche, offering a fixed interest rate of 10% simple annual interest and an 18-month term.
- Investment opening: Friday 27 November at 12:00 (UTC+1)
- Webinar: Thursday 26 November at 11:30 (UTC+1)
- Tranche A: up to €1,240,000
- Term: 18 months + possible six-month extension
- Interest: 10% simple annual interest
- Total return over the standard term: 15%
- Minimum return: ten months’ interest
Nine homes with gardens and private swimming pools
The project is located on Calle Lope de Vega in San Fernando de Henares, approximately 15 kilometres east of Madrid.
The development consists of nine terraced houses, each built on an individual plot of around 170 m².
The homes will offer approximately 255 m² of built area, four or five bedrooms, a garden, private swimming pool, storage room and three parking spaces.
The project also places particular emphasis on high-quality fittings and energy efficiency. The homes will achieve an A energy rating and feature air-source heat pumps with underfloor heating, triple glazing, home automation, photovoltaic pre-installation and electric vehicle chargers.
The design received recognition at the European Property Awards 2026 in the category for residential developments of two to nine units in Spain.
Planning permission granted and construction under way
One of Fénix’s key features is that the development is already under construction.
Planning permission has been granted for both phases of the project, and approximately 15% of the works have been completed. The foundations, ground slab and basement columns are finished, and work is now progressing on the structure.
Completion is expected in the fourth quarter of 2027.
In addition, disbursements from the portion of the loan allocated to construction will be made against progress certificates reviewed by an independent Project Monitor, who will oversee progress, costs and any potential delays.
A loan of up to €5.44 million in four tranches
Urbanitae will finance the outstanding construction costs and other expenses required to complete the development through a loan of up to €5.435 million, structured into four tranches.
The first, which is now opening for investment, is Tranche A, amounting to up to €1.24 million.
The subsequent tranches will be introduced as the project progresses and the corresponding financing needs arise.
The developer group has already contributed €2.83 million to the project, covering the land and construction and general costs incurred to date.
10% annual interest over 18 months
The main terms of Tranche A are:
- Amount: up to €1,240,000.
- Interest: 10% simple annual interest.
- Standard term: 18 months.
- Total return: 15%.
- Extension: possibility of an additional six months.
- Minimum return: equivalent to ten months’ interest.
- Principal and interest: payable at maturity.
Early repayment is possible at any time, provided that the minimum interest period is respected.
First-ranking mortgage and cash sweep
The loan is secured by a first-ranking mortgage over the property, with mortgage liability equivalent to 135% of the principal.
Additional security includes:
- A first-ranking pledge over the project’s bank accounts.
- An undertaking to pledge certain contracts relating to the development.
- An undertaking not to grant other creditors equal or superior security.
- Subordination of any additional corporate financing to Urbanitae’s loan.
- A cash sweep of the net proceeds from the sale of the homes.
This last mechanism means that the net cash generated when property sales are completed and notarised must be used to repay the loan.
Debt equivalent to 58% of the completed appraised value
The maximum loan amount represents approximately 58% of the appraised value of the completed homes.
This provides a margin between the debt and the projected value of the properties. Furthermore, repayment does not necessarily need to wait until all nine homes have been sold: according to the project’s estimates, selling approximately six homes at the projected prices would be sufficient to repay the loan.
This margin may provide flexibility if sales progress more slowly than expected or if prices need to be adjusted.
A product with limited competition in the area
San Fernando de Henares is an established residential municipality with good connections to Madrid by Metro, commuter rail and road. Adolfo Suárez Madrid-Barajas Airport is also approximately ten minutes away by car.
The commercial due diligence particularly highlights the limited supply of new-build single-family homes in the municipality.
Fénix is currently the only development of this type in San Fernando de Henares. Comparable new-build homes with private swimming pools analysed in nearby municipalities are priced between €4,000 and €4,700/m².
The development has already attracted initial reservations and expressions of interest, although no purchase agreements have yet been formalised.
How will the loan be repaid?
Urbanitae investors will be repaid through the proceeds from the sale of the homes.
As sales are completed through public deeds, the cash sweep mechanism will require the net cash generated by these transactions to be used to repay the financing.
The plan is to complete construction in the fourth quarter of 2027, begin handing over the homes at that point and complete repayment in the second quarter of 2028.
Why invest in Fénix?
Fénix combines a development already under construction with planning permission in place, a significant prior contribution from the developer group and a debt structure backed by first-ranking mortgage security.
Key highlights include:
- 10% simple annual interest.
- 15% total return over the standard 18-month term.
- Minimum return equivalent to ten months’ interest.
- First-ranking mortgage over the property.
- Cash sweep of the net proceeds from sales.
- Developer group with €2.83 million already invested in the project.
- Planning permission granted and construction already under way.
- Construction disbursements subject to certification by an independent Project Monitor.
- Maximum loan amount equivalent to approximately 58% of the appraised value of the completed homes.
- Residential product with very limited comparable supply in San Fernando de Henares.
Estimated timeline
The standard term of Tranche A is 18 months, with a possible six-month extension.
The main expected milestones are:
- December 2026: loan disbursement to finance the continuation of construction.
- First quarter of 2027: progress on construction and marketing of the homes.
- Fourth quarter of 2027: expected completion of construction, obtaining the first occupancy licence and beginning property handovers.
- Second quarter of 2028: completion of the outstanding property sales and expected loan repayment.
As with any property development, these dates may change depending on construction and sales progress.
Do you have any questions about the project?
You can ask your questions during the Fénix webinar, which will take place on Thursday 26 November at 11:30 (UTC+1).
Fénix will open for investment on Friday 27 November at 12:00 (UTC+1).
If you have any questions about the project, you can email us at contacto@urbanitae.com or call us on (+34) 911 23 25 22.